How to increase and optimize the productivity of an industrial 3D printing factory with minimum effort? We used simulation software to simulate the Additive Manufacturing process and the post-processing steps. Our customer use case makes the scaling process easy to follow.

 

How to gain the highest return on investment?
Scaling Additive Manufacturing (AM) production is an arduous task as you must take care of multiple factors before deciding on a scaling strategy. 

This article is for those who would like to increase and optimize the productivity of their AM factory with minimum effort. We will describe an actual customer use case that will make the scaling process easy to follow.

 

The main challenge
The customer wanted to increase production by adding three EOS P 396 systems to their two existing EOS P396 machines. However, the team was unsure whether the existing post-processing machines would handle the highest throughput with a one-worker shift. The AM product remained the same, which means that the workflow and the type of equipment also remained the same. The main challenge was to optimize the additional post-processing equipment and resources to have the highest throughput while keeping the cost per part as low as possible.

We supported the customer by developing a customized production model with suitable variable input parameters. Different scenarios can be generated by varying these input parameters to check the sensitivity of the throughput and cost per part. This information guides the customer in deciding the optimized scenario with the lowest additional investment to scale the AM production.

In summary, we identified the bottlenecks in the factory. By making small changes in post-processing, we increased the output by 24%, increased the margin by 124%, increased the return on investment (ROI) by 115%, and reduced the cost per part (CPP) by 18%.
 

Using simulation to solve the production optimization problem
A successful business case for serial production needs an in-depth analysis of all the production parameters that impact the output and the costs. These production parameters are often related to each other in a non-linear way, and therefore it is hardly possible to optimize them using an Excel spreadsheet. On the other hand, simulation software takes all production-related complexities into account and solves the optimization problem more straightforwardly. 

We at EOS use Tecnomatix Plant Simulation from Siemens and offer our service to help our customers simulate customized solutions to have a good process understanding for a make or buy decision.

We are using simulation software to simulate the AM process and the post-processing steps. A successful AM business needs to analyze the post-processing throughput and costs, sometimes making or breaking a business case. Simulation makes it easier to scrutinize the complex process chain.


Plant Simultation is a discrete event simulation which examines allthe planned events. For example, if a job takes 1h to process, the simulator will consider the start time and the end time of the job. It will not simulate how the job is processed, but at what time an event takes place. Other planned events are the shift times of workers, setup time, maintenance time of a machine, etc.

Plant Simultation is a discrete event simulation which examines allthe planned events. For example, if a job takes 1h to process, the simulator will consider the start time and the end time of the job. It will not simulate how the job is processed, but at what time an event takes place. Other planned events are the shift times of workers, setup time, maintenance time of a machine, etc.

Unpacking station x1
Powder management system x1
DyeMansion Powershot C x1
DyeMansion Powershot S x1
DyeMansion DM60 x2
UV treatment x1
Surface finishing x2
Drying area x1
Inspection table x1

With the EOS P 396, the customer can print jobs that contain 144 parts. Two EOS P 396 can produce 426 jobs per year or 61.344 parts per year. The customer needs to produce an additional 600 jobs per year or 66,400 additional parts per year. A first calculation shows that another three EOS P 396 would be needed to reach the target, meaning a high investment for the company. Therefore, the goal of the production simulation was to figure out if the output could be achieved using the sa me amount of post-processing equipment and take all the production complexities like failures, maintenance, and worker shift models into account.
 

How we proceeded:
The whole layout was divided into 3 areas (see figure 1):

  • AM printers
  • Powder Management
  • Post-Processing 

The customer prefers having three regions to minimize the risk of cross contamination of powder. We first built a simulation model with the two existing EOS P 396 and then a second model with three additional EOS P 396 together with the above listed equipment. The customer uses a one worker shift from Monday to Friday. During the analysis process, we carefully adapted all kinds of variables such as consumables and operators for the production facility.

A discrete event simulation can simulate all the events that are happening at a given point in time. It considers the start time and the end time but will not consider what happens in between.
For example, let’s say you enter the ATM at 17:50 and  you are out of the ATM at 17:53. The simulation shows an event at 17:50 which is start of the event and then jumps to 17:53 which is end of the event. In plant simulation the clock will jump from one scheduled event to the next one.
In the context of manufacturing, it is a part entering a machine for processing and exiting once the process is done. There can be various steps involved in processing a part (setup time, loading time, unloading time) which can all be included in the simulation. The simulation study helps increasing the throughput and utilization of the machines. It can also help determine number of workers, equipment, machines and storage size to have the best business case.

Analysis & Results of the Simulation
 

Optimizing the AM & Powder Management area
We started by simulating the AM area and powder management area before including the post-processing equipment. The shift model was unchanged from the original as follows:

  • Shift: 1 shift (8 hours), Monday - Friday
  • Build time: 20 hours.

Once the model was built, the first challenge was identifying the optimum number of workers for these two activities. We did five experiments (Exp.) and determined that one worker is enough for these two areas, as shown in Table 1. Whether we have 1 or 5 operators, the throughput remains the same (1.065 jobs per year). 

Number of Operators Jobs produced
Exp 1 1 1065
Exp 2 2 1065
Exp 3 3 1065
Exp 4 4 1065
Exp 5 5 1065

Table 1: No of operators for AM & Powder Management area and respective annual production 

Next, we focused on optimizing the number of powder transport boxes (EOS Multi-box, see Picture 1), allowing a worker to distribute powder to the EOS machines. In ten iterations, we identified that seven EOS Multi-boxes are the optimum number to achieve a throughput of 1062 jobs per year (see Table 2). The increased production by having more than seven Multiboxes does not justify the additional costs. There is only a gain of three jobs per year (from 1062 to 1065), and the increased cost, not shown in this report, does not warrant this small production gain.

Number of Multi-boxes  Jobs produced
Exp 01 1 184
Exp 02 2 367
Exp 03 3 551
Exp 04 4 732
Exp 05 5 911
Exp 06 6 983
Exp 07 7 1062
Exp 08 8 1064
Exp 09 9 1064
Exp 10 10 1065

Table 2: No of Multibox and the respective jobs

 

Optimizing the Post-Processing area:
After optimizing the AM and powder management area, the post-processing area was the next challenging task. It involved seven different process stations with ten steps: 

  1. Part cleaning in DyeMansion* Powershot C
  2. Ultrasonic cleaning
  3. Surface finishing
  4. Ultrasonic cleaning
  5. Drying
  6. Surface treatment in DyeMansion* Powershot S
  7. UV treatment
  8. Coloring in DyeMansion DM60
  9. Surface treatment in DyeMansion* Powershot S
  10. UV treatment

(*DyeMansion is part of the EOS Ecosystem)

Additionally, there were a few challenges regarding the customer workflow. For example, the blasting stations (Powershot S and C) from our partner DyeMansion should only process half of the parts produced in one build (72 out of 144 parts), in other words, two lots per build. However, for all other stations such as the DyeMansion DM60 coloring system, surface finishing, drying, and so on, all jobs need to be processed, in other words, one lot per build.

Once the original model was extended to include the post-processing area, we focused on finding the optimum number of operators. Starting with the AM optimum of 1062 jobs per year, we ran five different setups with 1-5 operators. As seen in Table 3, 4 operators would be needed for the post-processing area to have considerably higher throughput than the previous number of workers. 4 additional jobs do not justify the additional cost (not shown here) of an additional operator (848 vs. 849 jobs).

No of operators  Jobs build through AM Jobs produced through AM +
Post processing
Exp 1 1 1062 228
Exp 2 2 1062 666
Exp 3 3 1062 787
Exp 4 4 1062 848
Exp 5 5 1062 849

Table 3: No of operators for Post-Processing area and respective jobs

Conclusion
The key message here is that scaling and optimizing your AM production strategy can be a complicated task. It is a unique challenge, tailored to a specific layout with different key parameters for each scenario. Not analyzing and taking your strategy into account can lead to incorrect conclusions. With our simulation expertise and 30 years of AM experience we can make a winning scaling strategy for you to achieve the highest machine utilization and lowest cost per part.

Picture of a doctor holding a stethoscope

3D Printing Micro Factory

Additive Manufacturing Blog

We have been supporting Med In Town in the development of a duplicatable Micro Factory that allows 3d printed medical devices to be manufactured in close proximity to medical care centers. Thanks to the great success of this initiative, the company is now in a position to expand internationally and diversify its field of activity.  

EOS Metalpush Hall

EOS Pilot Production Line - Ready for you!

Additive Manufacturing Blog

EOS can optimize and verify customer production throughput, part quality, and business cases for critical parts and workflows with metal and polymer pilot production lines. Our digital factory near Munich airport is ready for your ideas with state-of-the-art Additive Manufacturing and post-processing equipment.